Repair Crew Scheduling Considering Variable Disaster Aspects - The Path to Intelligent, Collaborative and Sustainable Manufacturing - Part I Access content directly
Conference Papers Year : 2017

Repair Crew Scheduling Considering Variable Disaster Aspects

Abstract

Human beings have suffered from disasters continuously, therefore, the post-disaster efforts to reduce additional damages have been widely conducted. In this study, we focused on the repair crew scheduling to set a plan for repairing destroyed roads. Rural areas were considered because of limited link members of supply chain networks, and rural isolation caused by road destruction is the main concern of this study. To reflect the intrinsic nature of a disaster in the short-term, additional damages and variable damage rates were considered. The repair crew scheduling problem considering variable disaster aspects was proposed to minimize total damages caused by isolation. A small-scale experiment was conducted and the result showed that our model can be used to effectively reduce further damages compared to previous research.
Fichier principal
Vignette du fichier
456370_1_En_7_Chapter.pdf (515.29 Ko) Télécharger le fichier
Origin : Files produced by the author(s)

Dates and versions

hal-01666198 , version 1 (18-12-2017)

Licence

Attribution

Identifiers

Cite

Sungwoo Kim, Youngsoo Park, Kihyun Lee, Ilkyeong Moon. Repair Crew Scheduling Considering Variable Disaster Aspects. IFIP International Conference on Advances in Production Management Systems (APMS), Sep 2017, Hamburg, Germany. pp.57-63, ⟨10.1007/978-3-319-66923-6_7⟩. ⟨hal-01666198⟩
104 View
89 Download

Altmetric

Share

Gmail Facebook X LinkedIn More