A Collaborative Planning Model to Coordinate Mining and Smelting Furnace - Risks and Resilience of Collaborative Networks Access content directly
Conference Papers Year : 2015

A Collaborative Planning Model to Coordinate Mining and Smelting Furnace

Abstract

In this paper, we are interested in the tactical planning problem of mines and smelting furnace. The problem concerns a set of mines with one smelting furnace. We are faced to a multi-actor’s context for which a global optimization is not possible due to the independence of the services. This problem is solved using a set of local optimization model of mines bloc extraction and a model of smelting furnace. This paper begin with the state of the art related to the principal problems in mining process. It justifies the novelty of our work. Indeed, this paper aims to discuss on the impact of sharing information between downstream processes and upstream processes. Consequently, after the state of the art, the classical planning process using local optimization and the information sharing process are presented. In the following part, profits generated and related to different contexts: value-creation and approach are compared. At the end of the paper, conclusion and future extensions are presented.
Fichier principal
Vignette du fichier
fenemedre_15056.pdf (368.65 Ko) Télécharger le fichier
Origin : Files produced by the author(s)
Loading...

Dates and versions

hal-01303831 , version 2 (18-04-2016)
hal-01303831 , version 1 (17-01-2017)

Licence

Attribution

Identifiers

Cite

Fenemedre Qaeze, Romain Guillaume, Caroline Thierry. A Collaborative Planning Model to Coordinate Mining and Smelting Furnace. 16th IFIP Working Conference on Virtual Enterprises : Risks and Resilience of Collaborative Networks (PRO-VE 2015), IFIP International Federation for Information Processing, Oct 2015, Albi, France. pp.557-565, ⟨10.1007/978-3-319-24141-8_52⟩. ⟨hal-01303831v2⟩
331 View
325 Download

Altmetric

Share

Gmail Facebook X LinkedIn More