A Conceptual Model for Integrating Transport Planning: MRP IV - Advances in Production Management Systems: Value Networks: Innovation, Technologies, and Management Access content directly
Conference Papers Year : 2012

A Conceptual Model for Integrating Transport Planning: MRP IV

Abstract

In this article, a conceptual model, called MRP IV, is proposed in order to serve as a reference to develop a new production technology that integrates material planning decisions, production resource capacities and supply chain transport for the purpose of avoiding the suboptimization of these plans which, today, are usually generated sequentially and independently. This article aim is twofold: (1) it identifies the advances and deficiencies in the MRP calculations, mainly based on the dynamic multi-level capacitated lot-sizing problem (MLCLSP); and (2) it proposes a conceptual model, defining the inputs, outputs, modeling and solution approaches, to overcome the deficiencies identified in current MRP systems and act as a baseline to propose resolution models and algorithms required to develop MRP IV as a decision-making system.
Fichier principal
Vignette du fichier
978-3-642-33980-6_7_Chapter.pdf (197.54 Ko) Télécharger le fichier
Origin : Files produced by the author(s)
Loading...

Dates and versions

hal-01524188 , version 1 (17-05-2017)

Licence

Attribution

Identifiers

Cite

Josefa Mula, Manuel Díaz-Madroñero, David Peidro. A Conceptual Model for Integrating Transport Planning: MRP IV. International Conference on Advances in Production Management Systems (APMS), Sep 2011, Stavanger, Norway. pp.54-65, ⟨10.1007/978-3-642-33980-6_7⟩. ⟨hal-01524188⟩
55 View
232 Download

Altmetric

Share

Gmail Facebook X LinkedIn More