Dynamic Rescheduling in Energy-Aware Unrelated Parallel Machine Problems - Advances in Production Management Systems - Smart Manufacturing for Industry 4.0
Conference Papers Year : 2018

Dynamic Rescheduling in Energy-Aware Unrelated Parallel Machine Problems

Abstract

Advance in applied scheduling is a source of innovation in the manufacturing field, where new results help industrial practitioners in production management. The literature of rescheduling problems for single-objective optimization is well study, while there is a lack of extensive studies for the case of rescheduling for multi-objective optimization, especially for energy aware scheduling. This paper extends a previous work over an energy aware scheduling problem, modelled from a real industrial case study, extending its manufacturing environment to a dynamic one. To this end, two rescheduling techniques are developed to tackle machines disruptions (greedy-heuristic and meta-heuristic). They are compared to existing approach thought manufacturing environment simulations. The results give insight to improve the production management in terms of rescheduling quality and computational time.
Fichier principal
Vignette du fichier
472851_1_En_29_Chapter.pdf (361.97 Ko) Télécharger le fichier
Origin Files produced by the author(s)
Loading...

Dates and versions

hal-02177886 , version 1 (09-07-2019)

Licence

Identifiers

Cite

Sergio Ferrer, Giancarlo Nicolò, Miguel A. Salido, Adriana Giret, Federico Barber. Dynamic Rescheduling in Energy-Aware Unrelated Parallel Machine Problems. IFIP International Conference on Advances in Production Management Systems (APMS), Aug 2018, Seoul, South Korea. pp.232-240, ⟨10.1007/978-3-319-99707-0_29⟩. ⟨hal-02177886⟩
47 View
118 Download

Altmetric

Share

More