A Robust Facility Layout Planning Method Considering Temporal Efficiency - Advances in Production Management Systems: The Path to Intelligent, Collaborative and Sustainable Manufacturing Access content directly
Conference Papers Year : 2017

A Robust Facility Layout Planning Method Considering Temporal Efficiency

Eiji Morinaga
  • Function : Author
  • PersonId : 996246
Komei Iwasaki
  • Function : Author
  • PersonId : 1028100
Hidefumi Wakamatsu
  • Function : Author
  • PersonId : 996248
Eiji Arai
  • Function : Author
  • PersonId : 996249

Abstract

Facility layout planning (FLP) is an important stage for optimal design of manufacturing systems. A major approach is to define an evaluation index based on distance and find a layout which minimizes it. Temporal efficiency is not considered in this stage but in later stages. The resultant temporal efficiency may not be optimal enough, since decision and optimization in those stages are performed under the fixed layout. For this reason, the authors have developed FLP methods considering temporal efficiency. Those methods provide the optimal layout plan for a fixed production scenario. However, production environments change dynamically in actual manufacturing, and the layout plan is no longer optimal after the changes. In this paper, the conventional method is enhanced considering robustness against the changes.
Fichier principal
Vignette du fichier
456373_1_En_20_Chapter.pdf (2.1 Mo) Télécharger le fichier
Origin : Files produced by the author(s)
Loading...

Dates and versions

hal-01707270 , version 1 (12-02-2018)

Licence

Attribution

Identifiers

Cite

Eiji Morinaga, Komei Iwasaki, Hidefumi Wakamatsu, Eiji Arai. A Robust Facility Layout Planning Method Considering Temporal Efficiency. IFIP International Conference on Advances in Production Management Systems (APMS), Sep 2017, Hamburg, Germany. pp.168-175, ⟨10.1007/978-3-319-66926-7_20⟩. ⟨hal-01707270⟩
76 View
73 Download

Altmetric

Share

Gmail Facebook X LinkedIn More