The Generic Materials and Operations Planning (GMOP) Problem Solved Iteratively: A Case Study in Multi-site Context - Advances in Production Management Systems: Value Networks: Innovation, Technologies, and Management
Conference Papers Year : 2012

The Generic Materials and Operations Planning (GMOP) Problem Solved Iteratively: A Case Study in Multi-site Context

Abstract

This paper addresses the Generic Materials and Operations Planning (GMOP) problem, a multi-site operations planning problem based on the “stroke” concept. The problem considers a multinational company subject to positive and negative backlogs imposed by using returnable racks that have to be filled by end products and transported to customers, alternative operations (purchase, transformation and transport), different BOM structures given the different operation types (injection operations, assembly operations) performed in the various factories of the supply chain, and capacitated production resources. This paper describes and defines the “stroke” construct that mathematically models the relationships between operations and materials. The mathematical modelling approach is provided, as is a brief description of an operations planning tool that has been implemented. Furthermore, some results obtained in a first-tier level supplier of the automotive industry have been introduced.
Fichier principal
Vignette du fichier
978-3-642-33980-6_8_Chapter.pdf (606.73 Ko) Télécharger le fichier
Origin Files produced by the author(s)
Loading...

Dates and versions

hal-01524234 , version 1 (17-05-2017)

Licence

Identifiers

Cite

Julien Maheut, Jose P. Garcia-Sabater, Josefa Mula. The Generic Materials and Operations Planning (GMOP) Problem Solved Iteratively: A Case Study in Multi-site Context. International Conference on Advances in Production Management Systems (APMS), Sep 2011, Stavanger, Norway. pp.66-73, ⟨10.1007/978-3-642-33980-6_8⟩. ⟨hal-01524234⟩
88 View
80 Download

Altmetric

Share

More