Creation of Robust Schedule for Profit Based Cooperation - Balanced Automation Systems for Future Manufacturing Networks Access content directly
Conference Papers Year : 2010

Creation of Robust Schedule for Profit Based Cooperation

Abstract

Method for robust schedule preparation for domain of profit based cooperation is introduced in this paper. The method aims schedules, which are prepared and concluded step-by-step during the team formation phase. The method takes into account domain specifics, like incomplete information about the partners, and their various reputation and skill levels. The method is based on critical path dispatching rule, which is widely used in heuristics for np hard and continuous scheduling problems. Experimental results are presented for various workflow structures and other configurations of the domain.
Fichier principal
Vignette du fichier
Hodik10.pdf (476.22 Ko) Télécharger le fichier
Origin : Files produced by the author(s)
Loading...

Dates and versions

hal-01060720 , version 1 (16-11-2017)

Licence

Attribution

Identifiers

Cite

Jiří Hodík. Creation of Robust Schedule for Profit Based Cooperation. 9th IFIP WG 5.5 International Conference on Balanced Automation Systems for Future Manufacturing Networks (BASYS), Jul 2010, Valencia, Spain. pp.160-167, ⟨10.1007/978-3-642-14341-0_19⟩. ⟨hal-01060720⟩
45 View
32 Download

Altmetric

Share

Gmail Facebook X LinkedIn More